![]() Harlech Castle |
Yes, they’re taking a lot longer than originally planned and it may be a month or two before they’re finally released: Why?
- Considerable Spec Upgrade
- Component Sourcing turning into component manufacturing
- Mid project redesign to adopt the ungraded spec
- Clashing with other commitments
- Financing
These are explained a bit more below:
Spec Upgrade: At the outset this was going to be a simple chassis to use with the bodies blown up from 4mm prints. It very quickly got upgraded to newly designed bodies, sprung chassis, coreless motor and quartered axles and jackshaft
Component Manufacture: I’ll admit that with the demise of Markits (owner died) it hadn’t occurred to me that there would be a world shortage of crankpins. The solution was our first venture into Chinese manufacturing which was a significant capital outlay and was a bit scary the first time. We’ve been back to our Chinese manufacturer for more components.
Redesign: Fourdees on sight of the first iteration of the chassis decided that blown up bodies wouldn’t do as they’d just be blowing up the compromises used to make the 4mm version work. The bodies are all new CAD artwork and my early visits to the Festiniog Railway included regularly visiting the prototypes to clarify measurements and details.
Clashing commitments: Regular subscribers to my newsletter and blog will know two things. 1) I am a volunteer driver on the Festiniog Railway and also the volunteer rolling stock electrical engineer. 2) I have achieved retirement age. I’m not retiring bit it is changing things I do. I intend to do more driving whilst I am fit and able which impacts summer time available to model projects and I intend to progress some more of my own modelling interests.
Just to add to this Annie and I have both achieved that age where major topics for conversation are, “what’s for tea” and “when’s your next doctor/nurse/hospital appointment.
Money: All this Chinese manufacturing is all well and good. The item cost might be low but a MOQ of 1000 means the order is a sizeable chunk of money which has all been financed from my own pocket and some has had to wait for funds. To head off the suggestion that usually follows, I don’t want to take pre-orders or take money up front. Whilst an attractive idea on the face of it the potential problems should I spend the money and then for some reason can’t deliver are a noose I’d rather not put my head in.
Summary
Before I go into more detail on individual components I’d like to summarise where EDM Models is heading with recent component acquisitions. The regauging of NG7 Hunslet loco’s to 14mm gauge has seen us acquire tyres, gears, bearings, axles in quantities that mean we have parts to use in other models. Now the Castles have added crank pins, more tyres, more gears, quartered axles, cranks and springs to that selection of parts. The time and cost of their acquisition has slowed these two projects but that now places EDM Models well to introduce new models and to upgrade our existing kits. In short the time and cost has been a pain but worth it.
![]() |
Follow links for the full story |
coming soon |
![]()