Brymston RR – #16 – Where Did That Year Go

So, back in February I bemoaned the lack of progress on the RR as work got in the way. That lack of progress was maintained until about a ten days ago but the seed of progress was sowed when I temporarily repurposed my own layout as a O14 track demo.

Looking for the silver lining I am going to say the delay was a good thing. Having designed the corner board and then stalled coming back to it eight months later has allowed a design review.

It’s probably fair to say the first version was designed with imagination and no not a lot of physics. The review has allowed me to check the design, superimpose a realistic curve radii on a board whose job is to turn the railway through 90’ and then further revise the design around the track layout.

The prompt for the extra board now when there is very little to show on the first is that the king point for the yard is to be close to the edge of the board and the track from it will immediately start to curve and it was going to be difficult to get the alignment right without it.There is the added factor that once there is some track down it would be difficult to play trains without some track beyond the point. The above image shows how the two boards go together  and how the high level section mates. That isn’t fully detailed as it didn’t contribute to this design exercise.

I am lucky that I have posh 3D CAD in the form of SolidWorks for other uses but it proved ideal to design this board. A sort of pet hate is the layout that is flat. Not sure why it bother me so much, possibly because a now departed friend from my old model club whilst a profligate layout builder they were always flat boards with a backscene. On the first board I have taken the track above datum so on the corner board I was keen to see the ground drop below datum.

Using CAD speak each bit was designed as a part and was then put together in an assembly which creates the image at the head of this piece. All the parts can be seen in this exploded view.

Once happy with the fit of all the tabs and slots (and posh CAD helps here as it has tools to highlight errors) the parts laid out in 2D and a cutting scheme. The 3rd D now becomes a statement of “6mm ply for this bit, 9mm Ply for that bit”.

Having got the ply sheet sizes from the laser company I laid out the 2D cutting plot having done this sort of thing back when I worked for York Modelmaking and its not dissimilar to laying out etches. This probably saved me a few quid as it’s something the laser firm would charge for.

There was a bit of toing and froing with the files until we were all happy with them largely because posh CAD was being too clever for its own good at this stage. With this sorted the files were in for a cutting quote and to be honest I sat back thinking this is going to be where I learnt why people stick with flat boards.

The quote landed, I was pleasantly surprised, the quote was converted to an order and now we await the bits arriving.

I can already see the need for board three

Just for this illustration the third board is a copy of the first as I have done no design work for it yet. You will note that the viewing face changes sides .  This last sketch of my model room explains why. This would be the master bedroom if we were selling the house as it’s the largest but it’s in the extension and full of trains. Once upon a time I had visions of a grand layout but the day job took over most of the space and the modular approach is the antidote to getting nowhere with the larger layout.

You enter and see the viewing face of the first two boards as they sit on a peninsula made of kitchen units and have to go round the end to get to the work area. That work bench is where I try to concentrate on doing electrical, electronic and DCC type stuff.

Board 3 (& 4, 5 etc) are against the other wall and need to face inwards. I haven’t committed pen to paper or pixel to screen for board 3 but have in this instant realised there may need to be two board 3’s.  One and two are built with the idea of them being exhibited in which case 3 would need to be a fiddle yard for that whist at home it could be another scenic board. That thinking is for another day.

 

 

Loading

Pre-order – How Does That Work?

Pre-order – How Does That Work?

It is fantastic that Lionheart are doing the L&B in 7mm scale and I will be writing more about that in coming blog posts. This post is expressly to explain pre-ordering for these models.

The Short Version:

You order now, cart is set at zero so you’re not charged at this time, (the prices are shown in the product detail), when the models are imminent, I invoice, you pay, I send model.

Please don’t order if you don’t intend to pay

The Longer Version

The models are due in the Autumn of 2022. They are likely to sell well and ordering in advance is highly recommended. The quantity made is also likely to be determined by pre-orders received.

In an ideal world the process for taking your pre-order would be that the website collected all your payment details and kept them in a safe place until the models are nearly here and then charge your card. I investigated adding this functionality and it went something like this.

  • Me:       “Hello, web developer I need this functionality”
  • WebDev: ” We can look into that” insert money
  • WebDev:    “There is a plugin that will do that” insert more money
  • WebDev:    “It’ll need setting up and maintenance”  insert even more money

All well and good but that money they want inserting has to come from somewhere, half the credit/debit cards people use will have lapsed and the payment processors are awkward about stored cards. With the current card rules we can’t store card details ourselves, they are stored behind the bank security. When you actually get to the `pay up’ part of a transaction that takes place between you and the bank, only they see your card details and they send me a `they’ve paid up’ message.

My thought at this time were a) stuff that for a game of soldier and b) I need a plan B

Plan B

Please don’t make me live to regret this but Plan B is that I am going to trust you! Please only order if you fully intend to pay.

Here is what will happen.

  1. You order now,
  2. The cart is set at zero so you’re not charged at this time
  3. The prices are show in the product detail
  4. You complete the checkout so I know what you want and how to find you.
  5. When the models are imminent, I invoice you giving you options to use a card or bank transfer
  6. You pay,
  7. I send the model(s) when they arrive.

I’m going to say this again and then explain why. Please only order if you fully intend to pay. I will be ordering your models from Lionheart at the point you order it from me to ensure you get your model. As a new Lionheart dealer my first orders are pro-forma which means I have to pay them before they send me the models. That is why I say I want your money when they are imminent rather than in stock and why I am worried about timewasters turning round and saying `don’t want it now’

I do understand that circumstances change suddenly and I’d ask you to let me know asap if you want to cancel an order.

This process may evolve as the time gets nearer and if you want to pay now then drop me a line and I can take a payment and stash it away until I need to pay Lionheart

Loading